
RCM Case Study Part 3/4
Welcome to Part 3 of our in-depth RCM mini-series! In today’s video, we continue our dentist-inspired case study by exploring Failure Consequences and diving deep into the world of Preventive Maintenance. This session is packed with practical insights that reveal how to properly establish Preventive Maintenance tasks and their intervals.
What You’ll Learn:
Here’s the full list in the series:
RCM Case Study Part 1/4: Dive into the Operating Context and Functions!
RCM Case Study Part 2/4: Let’s get into Failure Modes and Failure Effects
RCM Case Study Part 3/4: How to Assigning Preventive Maintenance Task Intervals and Failure Consequences
RCM Case Study Part 4/4: How to Set Condition-Based Maintenance (CBM) Intervals Using the P-F Curve (posting August 25,2025)
Leave a Reply