Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » on Risk & Safety » Page 2

on Risk & Safety

A listing in reverse chronological order of articles by:



  • Greg Hutchins (editor) — CERM Risk Insights series

  • Doug Lehr — Equipment Risk and Reliability in Downhole Applications series

  • Sanjeev Saraf — Operational Risk, Process Safety series

by Greg Hutchins Leave a Comment

Good Project Management Leadership Will Reduce Project Risk

Good Project Management Leadership Will Reduce Project Risk

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The PMBOK(Project Management Institute Book of Knowledge) Guide states that project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Having a good plan, experienced PM, and excellent team is essential to great project management performance.  Managing project risks is key to success. Good project management decisions are vital to project success. To achieve this goal, you need good project management leadership.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

VUCA, Distruption and Risk

VUCA, Distruption and Risk

Breaking an old business model is always going to require leaders to follow their instincts. There will always be persuasive reasons not to take a risk. But if you only do what worked in the past, you’ll wake up one day and find that you’ve been passed by.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Communication Skills Really Matter

Communication Skills Really Matter

Guest Post by Bill Promfret (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Back in 1990, I was introduced to Og Mandino, a best selling American author, just three of his books, “The Greatest Salesman in the World” The Greatest Miracle in The World” and “The Greatest Secret in the World” these three books alone sold over 50 million copies, his lecture was on “How to write and Speak.” In his presentation, which had been a tradition for more than 40 years, was posted on YouTube not long after his death in 1996. In it, he explains the relationship among three critical elements of any level of success: knowledge (K), practice (P) and talent (T).

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Project Email Economics

Project Email Economics

Economics concerns itself with the determination of the most logical and effective use of resources to meet private and social goals for some form of benefit.  While primarily concerned with industry and business, its concepts of opportunity cost, supply and demand, present value, and mutual interdependence economics is also applicable to email; one of our most utilised forms of communication but, possibly, the most hated. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Company Acceptance of Hybrid PM is High Risk

Company Acceptance of Hybrid PM is High Risk

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

A Hybrid Methodology combining the speed and flexibility of Agile and the structure of Waterfall is feasible and practical. I base my opinion on the research I have done. I recently presented a Webinar to Project Management Institute (PMI) members on how to merge Agile and Waterfall to achieve a Hybrid methodology. The focus of this paper is to address the greatest risk to a company in implementing the new methodology i.e., acceptance of it. I addressed how to accomplish the merger to achieve a Hybrid method in a paper I wrote and posted on LinkedIn in May

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Risk Based, Decision Making

Risk Based, Decision Making

Go out on a limb. That’s where the fruit is.||
Jimmy Carter – U.S. President

Working It in VUCA time emphasizes Risk Based, Problem Solving (RBPS) and Risk Based, Decision Making (RBDM), which are the essence of self-management, execution, career resilience, and career agility.

Years ago, our mantra was risk management should be part of the tool box of all engineers.  Why?  Engineers live and work in the world of uncertainty and risk.  Then things changed.  In VUCA time, we say that risk is the entire toolkit and lens for ALL work and living in VUCA time.  McKinsey, the global consulting firm, explains the connection between problem solving and decision making:

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Risk Culture Does Not Exist: It’s All About Risk Maturity

Risk Culture Does Not Exist: It’s All About Risk Maturity

Guest Post by Patrick Ow (first posted on CERM ® RISK INSIGHTS – reposted here with permission)


Interest in risk culture has been growing since the 2008 Global Financial Crisis. It is a topic that is getting more and more spotlight.

Regulatory authorities are demanding that financial institutions improve their ‘risk culture’. Workplace health and safety authorities are urging organisations to improve their ‘safety culture’. Everyone is talking about having a ‘customer experience culture’. And the list goes on.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Mental Risk: Solitude is Pleasant: Loneliness is Not

Mental Risk: Solitude is Pleasant: Loneliness is Not

Guest Post by Bill Pomfret (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Mental Health Awareness week is fast approaching. This year [2022] it is from 9th-15th May, and the theme is Loneliness, Anna Neagle is right, in her book Cultivating and being happy in our own company is important, but even the most introverted among us benefit from human connection and where increasingly people have started working from home, or in a hybrid home/workplace setting, we need to proactively seek that connection out.  Connection can be with our close circle, or even from small talk with strangers the research shows that both are helpful for our well-being. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Agile EVM Based DOD Software Development Project WBS

Agile EVM Based DOD Software Development Project WBS

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

“Department of Defense (D0D) acquisition must improve program while working within budgetary constraints. The DoD community shows an interest in utilizing Agile methodologies, but struggles to reap Agile’s benefits. They encountered challenges including the historically built-up processes that enforce heavy-weight oversight, the outdated, manufacturing focused Work Breakdown Structure (WBS) provided in DoD Handbook: Work Breakdown Structures (WBS) for defense Material Items (MIL-STD-881C), and the inability of traditional waterfall-based process to accommodate iterative development.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Disruption is Creating New Work Worlds

Disruption is Creating New Work Worlds

There are lots of lessons to learn from Amazon. Never stop innovating or questioning the fundamentals of your business. Disrupt yourself before others do.
Brad Stone – Journalist & Author

Consulting firms, academics, and consultants are developing models for the Future of Work.   Price Waterhouse Coopers (PwC) developed a scenario called the Future of Work: A Journey to 2022.  The premise of the study is: “disruptive innovations are creating new industries and business models, and destroying old ones.”[i]  PwC outlined three distinct worlds of work: Blue, Green, and Orange.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Disengaged and Stressful Workplaces Create Risk for Organizations

Disengaged and Stressful Workplaces Create Risk for Organizations

Guest Post by Patrick Ow (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Gallup’s State of the Global Workplace: 2022 Report found that only 21% of employees are engaged at work and 44% of employees experienced a lot of stress on the previous day – both findings are up 1% from 2021.

In one of the largest studies of burnout, Gallup found the biggest source was “unfair treatment at work.” That was followed by an unmanageable workload, unclear communication from managers, lack of manager support and unreasonable time pressure.

Disengagement and stress in workplaces are good indicators of an organisation’s workplace climate. They can also provide insights into potential issues with the organisation’s culture.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

The Two Types of Agility You Need

The Two Types of Agility You Need

Guest Post by Howard Wiener (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

If your business is going to survive, you must be able to read and react to changes in your markets and continuously improve your competitive position.  It’s more important now than it’s ever been.

SWOT is a model often employed to characterize a company’s competitive position in terms of Strengths, Weaknesses, Opportunities and Threats.  If a competitor creates a new offering that you can’t match, that’s a weakness.  If you have one that they can’t match, it’s a strength. 

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Are you in Control of Your Risk

Are you in Control of Your Risk

Guest Post by Annette Davison Ph.D (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

According to the definition in ISO 31000, risk is the impact of uncertainty on [achieving] your objectives. Of course, this impact can be both negative or positive. ISO 31000 states the following:

“Clause 6.4.2 Risk identification: The organisation should identify risks, whether or not their sources are under its control.

Clause 6.4.3 Risk analysis: The effectiveness of existing controls.”

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Type of Contract You Bid on Effects Your Risk

Type of Contract You Bid on Effects Your Risk

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

There are two basic types of contracts applied to development projects. They are Firm Fixed Price (FFP) and Cost-Plus (CP). Each type has a number of different variations shown in Table 1. FFP contracts are for projects with mature technology, less uncertainty, and more predictability. CP contracts are for projects with new technology, a lot of uncertainty, and less predicability. There are other types of contracts but are out of scope for this paper.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Project Trust, Respect, & Toxicity: Impossible Menage a Trois?

Project Trust, Respect, & Toxicity: Impossible Menage a Trois?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

People!  People in positions of authority wish for popularity, they may demand respect in one way or another but, above all, being trusted is perhaps the most desirable.  Trust, they say, needs to be won, respect is awaited expectantly but not necessarily given enjoyably, and popularity is fleeting.  In the absence of trust and respect, and despite any feelings of friendship or congeniality, toxic environments can prevail even though their obnoxiousness is well known as is the souring effect on human relationships.

Everything, at some point, involves people and relationships of some sort will develop in one way or another.  Psychologically speaking, relationships are based on individuals and their personal needs or desires for socialising and maintaining both a physical and emotional balance.  The same is also true of groups of people.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • …
  • 42
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Why Do a Parts Count Prediction?
  • Burn-in Testing?
  • 14 Ways to Keep Maintenance Costs Low
  • Improving Your Operations Through the Use of Collaboration
  • Quality Objective 7: HIGH-RISK FAILURES IDENTIFIED

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.