Decision Type:
Method Category:
Categories: Terms
1) an evaluation to check, text, or verify. 2) The act of guiding, directing, or overseeing. 3) in process control terms it is a stable or consistent process experiencing only chance causes of variability.
Related Articles:
- Overview Of Chemical Plant Security
- Five Ways to More Effectively Facilitate Failure Modes & Effects Analysis (FMEA)This article discusses five ways to facilitate failure modes and effects analysis (FMEA) more effectively by conducting pre-session exchanges, asking powerful questions, using exercises that engage, anticipating disruption, and controlling the tempo. The foundations of systems thinking and facilitation apply to failure modes and effects analysis because the analysis requires a group to establish the nature of separate and inter-related components.
- The Steps in Developing a ISO 9001 Quality System
- 8 Steps to Creating an X-bar and s Control Chart
- Meeting Procrastination Risk or Productivity Opportunity
- Black beltFull-time team leader responsible for implementing process improvement projects—define, measure, analyze, improve, and control (DMAIC) or define, measure, analyze, design, and verify (DMADV)—within a business to drive up customer satisfaction and productivity levels.
- Change managementA business process to actively approve, monitor, and control the implementation of alterations or modifications to an existing design, supply chain, or manufacturing process.
- Control limitPart of a control chart, line(s) used to judge the stability of a process. On a Shewhart chart, and others, these line(s) represent control limits, or action limits. Other than on acceptance control charts, the control limits are not specification limits. The lines are statistically determined boundaries for the expected deviations from the center line due to random causes alone.
- Statistical process controlThe set of activities using statistical techniques to reduce variation, increase knowledge of the process, and direct the process in a desired manner. SPC is often associated with control charting and provides a means to identify and minimize unwanted process variation and maintain process stability.
- System safety managementAll plans and actions taken to identify hazards; assess and mitigate associated risks; and track, control, accept, and document risks encountered in the design, development, test, acquisition, use, and disposal of systems, subsystems, equipment, and infrastructure.
Leave a Reply