Details and Plans
Abstract
Greg and Fred discuss why and how the triple constraints of a project: schedule, cost, and scope variances result in risks that can result in project failure.
Key Points
Join Greg and Fred as they discuss schedule risk, cost risk, and scope risk. Topics include:
- What are schedule, cost, and scope risks?
- How do you measure each?
- How can each contribute to project failure?
- How can you manage and mitigate these risks?
Enjoy an episode of Speaking of Reliability. Where you can join friends as they discuss reliability topics. Join us as we discuss topics ranging from design for reliability techniques to field data analysis approaches.
- Social:
- Link:
- Embed:
Show Notes
Leave a Reply