Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
    • Asset Reliability @ Work
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Kovacevic Leave a Comment

The Top 5 Tips to Implementing a Successful Maintenance Planning & Scheduling Process

The Top 5 Tips to Implementing a Successful Maintenance Planning & Scheduling Process

Implementing a Maintenance Planning & Scheduling process can be trying, difficult and downright frustrating. How would you like to dramatically reduce the stress involved and see results quicker? By utilizing these 5 tips, you will be able to build a robust, highly efficient and effective process with reduced effort.

These 5 tips are time tested, and have been used to successfully launch or re-launch Maintenance Planning & Scheduling in numerous sites. The tips are not at all complicated, or very large, but they all add up to building a sustainable Maintenance Planning & Scheduling process. These tips are in no particular order, but they should all be used to realize the greatest benefit.

Service Level Agreements (SLA): Establishing SLA(s) with the key partners in the planning & scheduling process, will ensure all expectations are aligned between the parties. They also enable a specified level of service for the parties by specifying the timelines which they will be held account to. It is important to note that the SLA works both ways. The SLA will call out what maintenance expects from the other parties, but must also specify what is required of maintenance. In order to make the SLA work, both parties must benefit from it. Two of the most common SLAs that have been used are;

  • Storeroom SLA; The SLA with the storeroom ensures that the parts process does not become the bottle neck in the planning & scheduling process. Establishing a SLA with the storeroom ensures that Operations get prompt service and quick work order turnaround times. Included in the SLA with the storeroom, the storeroom will typically agree to:
    • Time to Process a Purchase Requisition
    • Time to Kit a Job

In return the Planning and Scheduling function will be required to:

    • Provide specific information on materials, e.g. Manufacturer, Part Number, etc.
    • Provide Work schedules at least 1 week in advance
    • Coordinate scheduling of work for long lead time materials with the storeroom
  • Operations SLA; The SLA with Operations is very similar to the one with the storeroom. It establishes timelines and commitments between both parties. Typically the Operations team will agree to;
    • Lock-in of Schedules & Maintenance Windows
    • Specified Advanced Notice of Schedule Changes, e.g. 24 hours.
    • How Work Requests Will be Submitted

In return the planning and scheduling team will agree to provide operations with;

  • On-Time Completion of Maintenance Windows
  • Time lime to Review and Process a Request
  1. Feedback is critical to the success and sustainability of the Maintenance Planning & Scheduling process. Whether it comes from operations, the storeroom or the craft, it is critical that the feedback is used to improve the process. Typically the feedback that the planning & scheduling process will receive is;
    • Job Plan Updates: These must be addressed to build the buy in of the craft team, as they will quickly stop providing feedback if the job plans are not updated.
    • Material Updates: This may be provided by the craft or the storeroom, but will impact the job plans.
    • Failures Reporting: In order to break the reactive cycle, defects must be eliminated. Failure data is vital to this.
    • Start-Up Issues: To ensure we meet our portion of the SLA with operations, we need to ensure we address all issues that delay an on time start up from a maintenance window.

The feedback is a key part of the continuous improvement loop in maintenance planning & scheduling. This is what enables the process to become sustainable, as we do not have to learn everything from the beginning when a job arises.

  1. Set Small Goals: When you break down the large tasks into small goals, it is easy to make progress. Everyone involved in the planning & Scheduling process should have a small weekly goal established. Two of my favorites are;
    • Develop 2 detailed job plans per week
    • Build 1 BOM per week

If you are starting the process from the very beginning, then to build a good scheduling process, the goals could be to;

  • Level the PM work load
  • Build a weekly schedule
  • Build a 4 week schedule

Small goals can be used in many different ways. However they are used, there needs to be accountability for them, so be sure to bring them up in the weekly maintenance meeting and address any gaps in achieving the goals.

  1. Stick to the Role: A planner has to stay focused on planning and future. They cannot, under any circumstances be pulled to address work in progress, such a breakdowns, chasing parts, etc.
  2. Have the Right Meetings and make them effective. Meetings are required to ensure communication happened, variances addressed and decision made. Too often meetings do not provide value. Use the 3 points below to get the meetings back on track;
    • Make the Meeting Effective
      • Have the Agenda Clearly Defined (Ensure the meeting has a purpose)
      • Ensure the meeting has specific inputs and outputs
    • Make the Meeting Efficient
      • Be on time
      • Stick to the agenda
    • Track the Outcomes
      • Review the outcomes prior to closeout
      • Record them with names and due dates
      • Review at the beginning of the next meeting

By ensuring that the meetings taking place have these elements, they will be reduced in time and increased in effectiveness. If these elements are not in the meetings, it may be time to remove the meeting and give people more time to focus on breaking the reactive cycle.

Try implementing one of these tips this week, and the next week another, until all five are being used. You will see the results almost immediately, allowing you and your team to break the reactive cycle and begin planning for profitability.

Which one of these tips do you find most value added? Which one made the biggest impact on your Maintenance Planning & Scheduling process?

Remember, to find success, you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic

HP RELIABILITY
Solve, Achieve, Sustain

No Fields Found.

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: planning

« Shaft Coupling Selection Issues
The Perfect Strength and Stress Concepts »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic
High Performance Reliability

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Risk Prioritization in FMEA – a Summary
  • What Are Best Practices for Facilitating Qualitative Assessments?
  • So, What’s Still Wrong with Maintenance
  • Foundation of Great Project Outcomes – Structures
  • What is the Difference Between Quality Assurance and Quality Control?

© 2023 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.