The floating drilling rig, operating in 6,000 ft. of water, pitched in rough seas 300 miles away from shore as the outer bands of the hurricane’s winds buffeted the drilling location. Per procedure, the crew installed the Storm Packer (SP) in the well to isolate its open wellbore from the ocean before the storm roared across the location – but it failed its pressure test. The crew then installed the back-up SP which passed the pressure test. The well was finally secured, and the 25,000-ton drilling rig was moved out of the hurricane’s path. Because the first SP failed, a 12-hour process took 30 hours to complete, while wind speed and wave heights increased.

Let’s face it, we as engineers, maintenance staff, etc. all love technology and the newest gadget. Our industry is never short of these new and shiny techniques, tools, sensors, etc. Now, this new tech can lead to significant improvements in 