Using DFMEAs as Intended
Abstract
Adam and Fred discuss how one of the forgotten core functionalities of DFMEA is its contribution to successful project management.
Key Points
Join Adam and Fred as they discuss
- Are DFMEA’s being used as a tool to guide where engineering resource is directed?
- Too many groups engage in overly extended and painful DFMEA’s.
- DFMEA’s should be used in a closed loop system that continuously evaluated design change and updates risk ranking.
Enjoy an episode of Speaking of Reliability, where you can join friends as they discuss reliability topics.
Join us as we discuss topics ranging from design for reliability techniques to field data analysis approaches.
- Social:
- Link:
- Embed:
Leave a Reply