Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
    • Asset Reliability @ Work
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • An Introduction to Reliability Engineering
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Mike Sondalini Leave a Comment

Road Tanker Design for Fast Unloading and Onshore Pump Drain Tank

Road Tanker Design for Fast Unloading and Onshore Pump Drain Tank

Road Tanker Compartment Design

Road Tanker Design For Fast Unloading And Onshore Pump Drain Tank. To completely empty a road tanker the compartments need to be designed to have a sump that permits total drain-out of the liquid from the lowest point. If a pump is mounted on the trailer, it is best mounted under the trailer. Where a pump is mounted on the tray or fenders it will cavitate at low tanker liquid levels. For an onshore unloading pump installation it is best to install a buffer tank between the tanker and onshore pump to let the road tanker completely drain-out before the pump starts cavitating. Tanker load-out pumps must have a very low net positive suction head requirement.

Keywords: onshore unloading pump arrangement, road tanker unloading, load-out pump, isotainer unloading, tank vortex

A road tanker liquid compartment ought to have a nearly full-length, deep, sloping sump if you want it to drain out completely at fast rates. The sump collects and funnels the ullage to the lowest point where the outlet nozzle is located. When a road tanker or isotainer is nearly empty the remaining liquid is moving slowly along the bottom. Yet the unloading pump is still drawing out at its full rate. This means the pump will be starved of liquid and it will run dry until enough product trickles in to fill the volute and be flung out as a surge of liquid.

Pumps with mechanical seals will have many seal failures in such situations. Fortunately there is a way to design the road tanker or isotainer to allow rapid drainage of the remaining ullage. The sketch below shows you two arrangements to eliminate trailer or truck mounted load-out pump cavitation and vortexing problems.

Notice that the outlet nozzle is at the very bottom of the elongated sump and faces downward to capture the last drop of liquid. Keep the outlet nozzle at least one pipe size bigger than the pump inlet flange size to allow easy, low-friction flow to the pump. Going two sizes bigger, if possible, is even better. The welds will need to be of high quality so transport vibration and flexing do not start cracks at inclusions and under-cuts. It is also good practice to stiffen the sump with gussets along its length so loads are distributed away from the welds and onto the tank walls.

The pump suction inlet should be set even lower than the compartment outlet nozzle so that the pump always has positive suction right up to the last drop. If you can’t set the pump below the sump nozzle, then set it as low as possible under the tanker barrel and run a full size pipe from the nozzle to the pump inlet and only reduce down right at the pump suction flange.

You can shape the sump to suit where the pump is located under the trailer. Make the slope as steep as is possible so the last of the liquid washes down the sump fast.

On-Shore Unloading Pump With Drain-Out Tank

If you are using an on-shore unloading pump to empty a tanker that does not have a decent sump, you will have slow ullage running along the compartment bottom. In this case install a buffer drain-out tank just before the on-shore pump and let the pump draw from the buffer tank while the ullage from tanker trickles out into the drain-out tank. The drain-out tank protects the pump from surging and running dry when the tanker ullage is low. Make the drain tank volume equal to about two minutes of pumping capacity.

The drain-down tank is first filled from the full road tanker. Once the unloading hoses are connected, the station valves are opened and the drain-down tank starts to fill. The tank vent valve is opened to release trapped gases and air. As the tank gradually fills the liquid level inside rises and also runs through the piping to the unloading pump.

The unloading pump outlet flange needs to be lower than the top fill height of the buffer tank. This insures the pump is also fully flooded before starting. You should be able to hear the gas coming out the vent. When the liquid level rises to the underside of the vent nozzle (notice the vent nozzle extends into the drain-out tank a small distance) you will hear a burbling noise and you shut the vent valve.

The drain-down tank is now full, the load-out pump and piping is flooded and you can start the pump and empty the tanker.

Selecting On-Shore Unloading Pumps

One other useful fact to help you unload road tankers and isotainers trouble-free, is to select pumps that easily handle low liquid level situations. You can tell these pumps by looking at their net positive suction head requirements. Select those that are happy to operate with low liquid levels and/or high liquid temperatures before they cavitate. Those sort of pumps will give you less problems at low ullage levels.

Disclaimer: Because the authors, publisher and resellers do not know the context in which the information presented in this article is to be used they accept no responsibility for the consequences of using the information contained or implied in any articles.

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

« The Cost of Opportunity
Supply Chain Risk Management »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series articles provided courtesy of Feed Forward Publications and Lifetime Reliability Solutions.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Significance Over Success. Innovation Over Change. Anticipation Over Agility
  • Maintenance Planning and Scheduling for World Class Reliability and Maintenance Performance
  • Self-Discipline Part 1
  • Is Safety Training Helpful?
  • FINESSE Facilitation: What Are Best Practices for Qualitative Assessment Analysis?

© 2023 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.