Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
    • Asset Reliability @ Work
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Mike Sondalini Leave a Comment

The Difference between Critical Spare Parts and Strategic Spare Parts

The Difference between Critical Spare Parts and Strategic Spare Parts

WHAT IS THE DIFFERENCE BETWEEN A CRITICAL SPARE AND A STRATEGIC SPARE, AS WE NORMALLY COMBINE BOTH AS ONE. IS THIS RIGHT OR NOT?

—

We are facing difficulty in developing a definition of Critical Spare Part Inventory. No one is able to define it in its true essence. The situation is further confused with the difference to strategic spare parts. Any guideline or standard where we can find it ?

In the past, every Plant Manager had their own definition of Critical Inventory which changed with time. In optimization of Inventory, the first step is to establish a definition of Inventory considering all factors like production loss, redundancy, safety hazard, failure frequency, and of course, the lead time? Still I am stuck in this phase. I cannot progress, and don’t know what to do 1st, 2nd, and so forth to proceed further in this journey?

Dear Ahmed,

A critical spare part is a component or assembly kept in inventory based on the justification that having it greatly reduces operating consequences and risk. Their purpose is to maximize plant and equipment availability. The decision to make a component or assembly a critical spare is arrived at by doing a criticality analysis for the item.

Strategic spare parts are those components and assemblies kept in inventory based on the justification that having them greatly reduces downtime when failure happens. They could be critical parts and also noncritical parts. Their purpose is to maximize maintainability and supportability.

An example of keeping a strategic spare part is when the time taken to procure a part is lengthy, or the part is difficult to source when needed. Another example is when assets get older and are superseded by newer models and newer technologies, the parts for the old equipment become fewer and eventually are no longer available. An everyday example of a strategic spare are the extra toilet paper rolls stored at arms reach from the toilet bowl. Running out of toilet paper is not a critical life or death event. But having no toilet paper is hugely inconvenient, so we carry spare toilet paper at-hand because it is greatly beneficial to do so. Those extra toilet paper rolls or boxes stored in the water closet are not critical spares, but they are strategic spares.

In regards your organisation’s spare parts inventory management. It seems to me, from what I understand of the situation, that your organisation has adopted inventory benchmarking targets and is making changes based only on reaching those targets without understanding the long term business and operating risks of those changes. As you mentioned, spare parts are used to reduce/eliminate operating and business risks. If you achieve inventory benchmark targets but replacement parts are not available in time to stop a failure, then the benchmark values are the wrong ones for your business. Before you adopt benchmark KPI’s it is necessary to assess the risk effects associated with a spare part. Your operation might be putting itself at greater risk by forcing inventory levels to meet benchmarks.

Which spares you carry in an operation should be based on the risk to the operation of not having those spares. It makes no sense to use an inventory measure in Pakistan that is applicable to organisations operating close to the manufacturer of an asset. You are right in thinking you need to factor for a company scenario where the lead time is higher due to many external reasons, like your procurement process, supplier location – normally not local in Pakistan, etc. Your aim with spares is to have them available in time to swap out the degrading part before it fails and stops the operation. If delivery is much faster than the rate of degradation, then you can order the spare part and it is sure to arrive before the failure. But if delivery takes longer than the time between identifying the problem and getting the replacement, then you would carry those parts as spares.

The one proviso on carrying spares in your store is you do not want to carry a spare part that will not be used until many years in the future. It can take lots of years for parts to degrade and if you had a replacement in store for all the years during which it is never going to be needed you would be unnecessarily tying up your capital. So part of your decision making on which spares to keep in store is to identify when parts will actually be required due to aging and usage. The decision to carry such spares is again based on the risk to your operation of parts are not available when needed. It can be a good risk management decision to buy spares at the time an asset is brought and to keep the spares for years even though you know they won’t fail for a long time. These difficult choices need to be assessed and considered by the managers in your company and then go forward with the plan they agree on.

I hope these thoughts and ideas provide you with some guidance to resolving your question on the difference between a critical spare part and a strategic spare for your inventory management endeavors.

All the best to you,

Mike Sondalini

P.S. If you have questions on life cycle asset management, equipment maintenance strategy, defect elimination and failure prevention, or plant maintenance and reliability, please feel free to contact me by email.

Filed Under: Articles, Life Cycle Asset Management, on Maintenance Reliability

« Greg Carroll: Future of Work – ERM – Interviewed by James Kline
Leveraging Foresight via Root Cause Analysis & Defect Elimination »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Headshot of Mike SondaliniArticles by Mike Sondalini
in the Life Cycle Asset Management article series
articles provided with permission of Plant Wellness Way EAM and Lifetime Reliability Solutions

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • So, What’s Still Wrong with Maintenance
  • Foundation of Great Project Outcomes – Structures
  • What is the Difference Between Quality Assurance and Quality Control?
  • Covariance of the Kaplan-Meier Estimators?
  • Use Of RFID In Process Safety: Track Hazardous Chemicals And Track Personnel

© 2023 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.