Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » on Maintenance Reliability » Page 25

on Maintenance Reliability

A listing in reverse chronological order of these article series:



  • Usman Mustafa Syed — Aasan Asset Management series

  • Arun Gowtham — AI & Predictive Maintenance series

  • Miguel Pengel — Asset Management in the Mining Industry series

  • Bryan Christiansen — CMMS and Reliability series

  • James Reyes-Picknell — Conscious Asset series

  • Alex Williams — EAM & CMMS series

  • Nancy Regan — Everday RCM series

  • Karl Burnett — History of Maintenance Management series

  • Mike Sondalini — Life Cycle Asset Management series

  • James Kovacevic — Maintenance and Reliability series

  • Mike Sondalini — Maintenance Management series

  • Mike Sondalini — Plant Maintenance series

  • Andrew Kelleher — Process Plant Reliability Engineering series

  • George Williams and Joe Anderson — The ReliabilityXperience series

  • Doug Plucknette — RCM Blitz series

  • Robert Kalwarowsky — Rob's Reliability Project series

  • Gina Tabasso — The Intelligent Transformer Blog series

  • Tor Idhammar — The People Side of Maintenance series

  • André-Michel Ferrari — The Reliability Mindset series

by Mike Sondalini Leave a Comment

How to Use Ben Franklin’s Distribution Curves for Performance Monitoring

How to Use Ben Franklin’s Distribution Curves for Performance Monitoring

 Use Ben Franklin’s Distribution Curves for Performance Monitoring and Fast Improvement. Ben Franklin used statistical analysis to change his life. By measuring his ‘gaining of Virtue’ he quickly became rich and famous. You can change your business performance in the same way. But be cautious – Franklin’s method changed his behaviour forever.

[Read more…]

Filed Under: Articles, Life Cycle Asset Management, on Maintenance Reliability

by Nancy Regan Leave a Comment

Manufacturer Recommended Maintenance

Manufacturer Recommended Maintenance

Should you implement the manufacturer’s recommended maintenance schedules? Not without sanity-checking them first.

Be sure you consider your operating environment, which the manufacturer is unable to do.

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by André-Michel Ferrari Leave a Comment

Conditional Reliability and Boardroom Conversations

Conditional Reliability and Boardroom Conversations

Definition of Reliability

Reliability, in its academic root, is defined as the probability that a system will perform its intended function in a specified mission time and within specific process conditions. Reliability (R) is related to the Probability of Success as opposed to the Probability of Failure (F), and the relation between R and F is:

$$ \displaystyle \large R = 1 – F (t) \ \:\:\:\: \:\:\:\: (for \:mission\: time\: t) $$

In the above context, a reliability example would be: What is the probability that a centrifugal pump in a sheltered enclosure will push 3,000m3/day of sweet crude oil without unplanned failures for a period of 8,760 running hours?

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The Reliability Mindset

by Arun Gowtham Leave a Comment

Improving Reliability of Fleet

Improving Reliability of Fleet

‘Fleet’ is the representation of a population of repairable products that are currently in use out in the field by customers. Repairable is the keyword differentiating a ‘fleet’ from commonly known consumer product ‘units’. The differentiation is key in understanding the type of reliability program needed.

[Read more…]

Filed Under: AI & Predictive Maintenance, Articles, on Maintenance Reliability

by Mike Sondalini Leave a Comment

Maintenance Planner and Scheduler Competencies and Skills

Maintenance Planner and Scheduler Competencies and Skills

To be a great Maintenance Planner and Scheduler you need to know a lot about your equipment’s’ engineering, how to manage complicated projects well, use world class maintenance processes for creating equipment reliability, and a whole lot more.

Recently I was asked what skills and competencies a Maintenance Planner and Scheduler needs to master to do world class maintenance planning and scheduling.

[Read more…]

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

by André-Michel Ferrari 1 Comment

Life Models for Repairable Versus Non-repairable Assets

Life Models for Repairable Versus Non-repairable Assets

Definition of repairable versus non-repairable assets

A common error when performing a life analysis for an asset is to confuse repairable and non-repairable assets. The mathematical determination of the life characteristics for each model is different, so throwing a simple “Weibull analysis” at them might lead to the wrong results but also the loss of valuable information.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The Reliability Mindset

by Arun Gowtham Leave a Comment

How AI complements Reliability Engineers

How AI complements Reliability Engineers

The tasks of a Reliability Engineer are long & diverse. While heavily dependent on the industry one is working in, it generally involves all aspects of the Equipment – from Design to Manufacturing to Operation to Maintenance. Even though the responsibility is wide, the resources available for a Reliability Engineer within an organization are limited. Often, there are only a few Reliability Engineers managing hundreds of Equipment. Given this current situation, the arrival of AI seems like a perfect resource to complement the work.

[Read more…]

Filed Under: AI & Predictive Maintenance, Articles, on Maintenance Reliability

by Mike Sondalini Leave a Comment

How to Get Optimal Enterprise Physical Assert Utilization and Asset Performance

How to Get Optimal Enterprise Physical Assert Utilization and Asset Performance

Getting excellent enterprise physical asset utilization and maximum asset performance needs business-wide and life-cycle-long coordination and cooperation.

By coordinating and merging business-wide data and asset historical performance records into useful asset information, you can make timely and informed decisions that safely and profitably maximize the performance and value contribution of your enterprise physical assets

To go down the path of getting operating asset optimization it is necessary that you first identify what measures will be used to determine the “optimal asset utilization” state.

[Read more…]

Filed Under: Articles, Life Cycle Asset Management, on Maintenance Reliability

by Nancy Regan Leave a Comment

Is Criticality Analysis Required?

Is Criticality Analysis Required?

A common step in a RCM program is to conduct a critical analysis to prioritize further analysis of those parts of the system that are critical to the operation. Yet, is criticality analysis required?

No, it is not.

Let’s explore why this may be so for your situation.

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by Miguel Pengel Leave a Comment

Using Monte Carlo Simulations in Excel to Assess Uncertainty in Asset Replacement Decisions

Using Monte Carlo Simulations in Excel to Assess Uncertainty in Asset Replacement Decisions

Industrial operations that have operating horizons exceeding the lifespan of their assets face a crucial decision as they approach this timeline’s end (but not enough to operate the equipment until its full economically optimal life).

Specifically, they must decide whether to overhaul the asset, replace it with a new one, or rent the equipment until operations conclude. Given the numerous variables with inherent uncertainties in the financial models, how can they be confident in their decision?

[Read more…]

Filed Under: Articles, Asset Management in the Mining Industry, on Maintenance Reliability

by André-Michel Ferrari Leave a Comment

Building a RAM model? How granular do you need to go?

Building a RAM model? How granular do you need to go?

Reliability, Availability, and Maintainability (RAM) modeling overview

The fundamental purpose of Reliability, Availability, and Maintainability (RAM) modeling is to quantify system performance, typically in a future time interval. A system is a collection of items that operate together to produce an output, often a production value. These items can include subsystems, components, software, human operations, and more. For example, an automobile can be viewed as a system with subcomponents like the drive train, engine, gearbox, etc. In RAM models, it is crucial to consider the relationships between these items to determine the system’s final output. They have proven effective in various industries as tools for cost avoidance, decision-making, and validating assumptions made by internal stakeholders.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, The Reliability Mindset

by Arun Gowtham Leave a Comment

Introduction: AI & Predictive Maintenance

Introduction: AI & Predictive Maintenance

If you’ve ever wanted to learn more about how new Digital technologies like Artificial Intelligence (AI), Machine Learning (ML), Industrial Internet of Things (IIoT), Remote Data Sensing, and Industrial Automation apply to Reliability Engineering, then you’ve come to the right place.

[Read more…]

Filed Under: AI & Predictive Maintenance, Articles, on Maintenance Reliability

by Mike Sondalini Leave a Comment

Why Understanding Statistical Process Control Is Important

Why Understanding Statistical Process Control Is Important

Behind all lasting business success is the ability to make business processes work successfully. Random success in business is due to luck. But lasting success relies on knowing how to use statistical process control to make your processes more successful more often.

[Read more…]

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

by George Williams Leave a Comment

Duration of Job vs Labor Hours Required

Duration of Job vs Labor Hours Required

by Phil Swanton

When planning and scheduling, we need to have estimated hours to be able to schedule efficiently. Without estimated hours it makes it close to impossible to know your resource consumption. To take your scheduling efforts to the next level you need to understand the difference between Duration of job vs. labor hours required to perform the tasks.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Karl Burnett Leave a Comment

Make the Ships More Durable

Make the Ships More Durable

“His Majesty Will Have A Fleet Upon The Durability Of Which There May Be Some Dependence.”

Balancing Fleet Size with Workforce Size

In 1763, the Seven Years’ War ended and the Royal Navy demobilized. The Earl of Sandwich left the office of the First Lord of the Admiralty for the second time. At the end of the war, Britain had 149 ships of the line. Scrapping, retirement, and storage reduced the fleet size and  maintenance requirements. The navy was trying to manage a shrinking fleet with a shrinking budget. 

In 1763, the Admiralty requested a report of the total value of all ships and their stores, and an analysis of the “annual cost of replacing them in cycles between twelve and sixteen years,” according to historian N. A. M. Rodger. The Admiralty also asked for an estimate for annual repair and maintenance at task work rates if they expanded the number of shipwrights to 3000. (Shipwrights were the carpenters in dockyards who built and repaired ships.)

By 1765, only 47 of the 140 ships were in good condition. The Navy Board made a plan to increase the number of ships in good condition to from 47 to 63, but the plan required three years and an extra £2,000,000. Once restored to good condition, the plan assumed that the existing shipwright workforce could maintain a fleet of 90 ships. This approach would only work if the shipwrights were allowed to maximize overtime all summer, for every summer to come…the workforce and labor budget were at maximum capacity. To actually maintain 140 ships in good condition, the shipwright workforce would have to be expanded from 3,150 to 4,200. The government did not want to expand its civilian industrial labor base at a time when it expected a peace dividend.

[Read more…]

Filed Under: Articles, History of Maintenance Management, on Maintenance Reliability

  • « Previous Page
  • 1
  • …
  • 23
  • 24
  • 25
  • 26
  • 27
  • …
  • 96
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • The Biggest FMEA Mistake You Can’t Afford to Make!
  • Team Building: Strengthening Connections for Success
  • Sigma Level and Process Capability Indices
  • FMEA Quality Objective 9: Design Improvements
  • Reliability Testing 101: Purpose, Timing and Value

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.