Maintenance Backlog Work Order Scheduling using Queuing Theory

Your Reliability Engineering Professional Development Site
Author of Plant Maintenance, Maintenance Management, and Life Cycle Asset Management.
This author's archive lists contributions of articles and episodes.
by Mike Sondalini Leave a Comment

by Mike Sondalini Leave a Comment

PLANT WELLNESS WAY EAM METHODOLOGY USES THE ‘IONICS’ STRATEGIC ASSET MANAGEMENT PLAN FOR BUILDING AN ASSET MANAGEMENT SYSTEM
SIMPLY FOLLOW THE INDUSTRIAL AND MANUFACTURING WELLNESS BOOK TO CREATE YOUR ORGANIZATION’S ISO 55001 SAMP
by Mike Sondalini Leave a Comment

Many people believe Proactive Maintenance is the ultimate physical asset management strategy—but there is one better strategy. To get world class reliability at the least cost there must be no maintenance. Only a “wellness” paradigm can achieve that result.
by Mike Sondalini Leave a Comment

Often used to pump slurries, helical rotor pumps (also known as progressivity cavity pump, eccentric screw pump, mono pump) use a spiral rotor to move a chamber full of product through the pump. When moving slurries it is critical that the rotor wipes the rubber or elastomer stator firmly, else fine particles get between the rotor and stator and rip material out. This article discusses a major operating problem when the wrong size rotor was used in a stator.
[Read more…]by Mike Sondalini Leave a Comment

This activity-based costing (ABC) method calculates the actual cost of a failure incident and uses the total dollar value to the business as the means to rate equipment criticality. The criticality of an item of plant is determined by the cost consequences and losses of equipment failure across the whole company. Using this method puts a real dollar value on a production equipment loss incident. This financially robust and reliable method provides an accurate way to prioritise production equipment and to justify the necessary risk management and maintenance measures to protect against failure. It recognises that a production failure event has cost repercussions throughout an organisation affecting many people and departments, with all of them incurring costs. These costs are lost business profit that could have been earned and banked, but for the incident. The financial model reflects the actual production and maintenance practices in the operation and their cost implications to the whole organisation if they are inadequate. It delivers clear indication of the responsibility’s managers, supervisors, operators, and maintainers have of properly running, maintaining, and caring for plant and equipment to prevent production-losses to the business.
by Mike Sondalini Leave a Comment

Reinforcing bar is forged steel used in concrete to give the otherwise weak concrete structural tension strength. Reinforcing bar manufacturing is done in a factory using computerised machines to straighten, cut and bend the steel. It is a highly automated process once the bar is loaded onto the manufacturing machinery. These machines are computer controlled and form the bar to the shape and dimensions instructed. The bar specification and dimensions are identified from the engineering drawings by the Scheduler who enters the details into a scheduling software program. The program converts the reo-bar size requirements into computer controlled manufacturing instructions for the machines and a delivery schedule for the production shop.
Our assignment was to identify opportunities to improve the business and streamline the operation from production through to delivery.
by Mike Sondalini Leave a Comment

by Mike Sondalini Leave a Comment

Example ACE 3T (Target-Tolerance-Test) Procedure with Reliability Standards: Machine performance is totally dependent on human beings. To address the problem of human error causing equipment failure, an Accuracy Controlled Enterprise sets best practice quality standards and uses 3T Target-Tolerance-Test work task quality control that assures high quality workmanship for high reliability results. Their work procedures are standardised so everyone follows the same methods to produce the same results, their training teaches people how to do craftsmanship work that creates outstandingly reliable plant and machinery. They create the reliability they want and as a result achieve operational excellence.
by Mike Sondalini Leave a Comment

Road Tanker Design For Fast Unloading And Onshore Pump Drain Tank. To completely empty a road tanker the compartments need to be designed to have a sump that permits total drain-out of the liquid from the lowest point. If a pump is mounted on the trailer, it is best mounted under the trailer. Where a pump is mounted on the tray or fenders it will cavitate at low tanker liquid levels. For an onshore unloading pump installation it is best to install a buffer tank between the tanker and onshore pump to let the road tanker completely drain-out before the pump starts cavitating. Tanker load-out pumps must have a very low net positive suction head requirement.
[Read more…]
This simple example explains how to calculate the failure rate of parts, known as the Hazard Rate, using a drinking glass. Historic records, like maintenance, operating, supply chain, and financial information, are accessed to understand the situation being analyzed and gather modelling data. Once all necessary information is collected and the situation is investigated, then proposals to address and solve the problems causing and permitting the failure to happen are selected and a business case is developed.
by Mike Sondalini Leave a Comment

Value Stream Mapping is a business process improvement tool. It derives from the Toyota Production System where it was used to identify the seven wastes in a production process. It is now used across all business processes because the principle of finding and removing waste applies throughout every business.
by Mike Sondalini Leave a Comment

Technological inheritance, defect inheritance, and quality inheritance transfer to the future. To create a better future for your organization you first must create a better past so it can later inherit the preordained successes you designed and imbedded into your company.
by Mike Sondalini Leave a Comment

Using Reliability Principles for a Cheap Way To High Pumping Circuit Availability. High plant availability is achieved by having redundant equipment that can be brought on-line as soon as the operating unit has failed. Redundancy is expensive as there are two items to buy, two to install and two to maintain at full operating capacity. There is an alternate option for maintaining high pumping circuit availability by designing quick methods to bring mobile equipment into the circuit when pumps are down. This article explains how to set-up piping for a mobile pump to maintain operation when the normal duty pump is out of use.
[Read more…]by Mike Sondalini Leave a Comment

These are the slides from Mike’s conference presentation at the SIRFRt CM & Lube Forum 2008 Conference.
by Mike Sondalini Leave a Comment

PREVENTIVE MAINTENANCE STRATEGY IN A PLANT WELLNESS WAY EAM SYSTEM-OF-RELIABILITY
IN A PWW EAM SYSTEM-OF-RELIABILITY, PREVENTIVE MAINTENANCE STRATEGY IS TO REPLACE PARTS WHEN EXCESSIVE STRESS BUILD-UPS IN THEIR MICRO-STRUCTURE