Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Gang
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Crime Lab
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » Page 185

Articles

Find all articles across all article series listed in reverse chronological order.

by Adam Bahret Leave a Comment

Introducing Program Risk Effects Analysis (PREA)

Introducing Program Risk Effects Analysis (PREA)

I introduced my new program tool “Program Risk Effects Analysis” (PREA) at the RAMS Conference in Orlando this week.  It’s a great tool to assist in accessing if program schedule or resource should accommodate found design risk from testing or analysis.

-Adam

 

Filed Under: Apex Ridge, Articles, on Product Reliability

by Carl S. Carlson Leave a Comment

Establishing FMEA Ground Rules and Assumptions

Establishing FMEA Ground Rules and Assumptions

FMEA teams should agree to the ground rules that guide the analysis and the underlying assumptions that impact the entire FMEA. Failure to do so will add complexity and confusion to the resulting FMEA, and waste people’s time. Don’t miss this important step in FMEA preparation.

“Your assumptions are your windows on the world. Scrub them off every once in a while, or the light won’t come in.” Isaac Asimov

[Read more…]

Filed Under: Articles, Inside FMEA, on Tools & Techniques

by Doug Plucknette Leave a Comment

10 Proactive Activities & Measures to Improve Your HSE Program

10 Proactive Activities & Measures to Improve Your HSE Program

In past articles I have often referenced Dr. Aubrey Daniels and the use of Behavioral Psychology and Analysis in the workplace. In the late 1980’s I was fortunate enough to attend a 2-week course in Performance Management put on by Dr. Daniels and two of his associates where we learned the importance of measuring behaviors as opposed to results. To say that this course was enlightening would be an understatement as it was in this class I first learned why we need to measure leading indicators as opposed to results. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Perry Parendo Leave a Comment

Respect all and fear none – Coaching and NPD

Respect all and fear none – Coaching and NPD

In sports, the mantra of “Respect all but fear none” is used by many coaches. This same philosophy is appropriate for New Product Development. Respect the design or process – nothing is simple. Yet, do not fear new things. A healthy respect for trying new things. This is how we coach and how we consult! [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

by Greg Hutchins Leave a Comment

Design Assumption Risks

Design Assumption Risks

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This story is about risk at the enterprise program/project level.  Design is based on primarily requirements and assumptions.  Meeting requirements is usually achievable if they are complete and clear. Soft or poorly written requirements are the source of cost and schedule growth for many projects. Assumptions made during the analysis or design phase if wrong are also a source of poor project performance. This story is one example of a bad assumption. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

The 9 Great Benefits of a CMMS*

The 9 Great Benefits of a CMMS*

A computerised maintenance management system (CMMS) is the maintenance department’s most important tool. It provides insight into the behaviour of the facility’s individual assets, i.e. the plant and equipment. For a CMMS to be of use it must be used as an information ‘bank’ that can be investigated. There are 9 really good reasons to use a CMMS. And each one of them alone makes a CMMS worth having. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Dennis Craggs 3 Comments

When should SPC be used?

When should SPC be used?

Introduction

Many companies use SPC to control their manufacturing and assembly processes. Other companies use 100% inspection and some companies do nothing. How can one choose between these three alternatives?

To make a rational choice, some questions need to be answered.

  • What are the costs of internal and external failure on similar product?
  • Is the product design and/or process flow new, modified or carryover?
  • Are critical characteristics for the part and process known?
  • Are the process capabilities known?

[Read more…]

Filed Under: Articles, Big Data & Analytics, on Tools & Techniques Tagged With: Process capability, Statistical Process Control (SPC)

by Perry Parendo Leave a Comment

Business Results Focus

Business Results Focus

We provide business solutions. How can we prove it? This video provides the basis for our experiences with results. [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

by Mike Sondalini 1 Comment

Lubrication Cleanliness & Filtration

Lubrication Cleanliness & Filtration

When oil in gearboxes become contaminated there is a rapid loss of bearing operating life. It is critical that metal particles, dirt, sand, oxidisation products, etc be removed from the oil before they gouge and tear-up the finely toleranced machine parts. Oil replacement, contamination prevention and oil filtration are common practices religiously adopted by the best in the equipment reliability management business. This article explains the fine requirements for successful contamination control to insure long trouble- free equipment life. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Greg Hutchins 2 Comments

Critical Risks and Enterprise Risk Management

Critical Risks and Enterprise Risk Management

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In other pieces the Lloyd’s of London City Risk and the Natural Hazard Mitigation Saves studies were discussed.  It was noted that both studies provide an assessment of the costs associated with the adverse impact of risk events.  The Natural Hazard study focused on natural Hazards, while the Lloyd’s study incorporates both man-made and natural hazard risk events. 

This piece will examine the policy recommendations made by the Organization for Economic Cooperation and Development (OECD) for managing Critical Risks and its relationship to ISO 31000:2018. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Robert Allen 1 Comment

Simplified Project Management (Part 2)

Simplified Project Management (Part 2)

In Part 1 of this article series, we explored a simplified project management process using a phase/gate structure that enables a robust project planning and execution thought process.  Now let’s identify some deliverables within each of the phases.

These deliverables would be required and reviewed at each of the gates.  Below is a brief description of each:

[Read more…]

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: Waterfall phase/gate process

by Adam Bahret Leave a Comment

Use Case 7 Frozen Lake Running

Use Case 7 Frozen Lake Running

A very personal Use Case 7

(Have you been introduced to Use Case 7? )

Filed Under: Apex Ridge, Articles, on Product Reliability

by Adam Bahret Leave a Comment

Introduction to Use Case 7

Introduction to Use Case 7

“Use Case 7” is a concept I am rolling out.  Use Case 7 is the way a customer may use your product in a manner that is way beyond anything you expect.

Examples:

  1. Me using a power drill as a hammer. “I’m not walking all the way back in the house to get a hammer just to put a nail in!”
  2. My Dad when he used to load 300lbs of firewood into the back of his Nissan Sentra. Then make us kids lay on top of it since the seats had to be folded down.  But I think that last part is more of a child services situation.
  3. That wire shirt coat hanger with the leather motorcycle jacket on it, and three pairs of wet ski glove clipped to it…and you hold onto it when you bend down to pick up your shoes.
  4. You when you were sixteen and had your parents car in a full drift in the mall parking lot on Saturday night (I’m projecting here), or when you owned that same car and didn’t change the oil…ever (sorry Dad)

[Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Doug Plucknette 1 Comment

10 Sure Signs That Safety Isn’t First

10 Sure Signs That Safety Isn’t First

In nearly 40 years I’ve seen it all, from those who are proud to be the best to plant sites that are in such a deplorable state, you hope you get through the tour without some type of injury, fire or explosion.

The first thing I learned when I began providing Asset Management and Reliability Centered Maintenance services as a consultant was how lucky I was to have worked my first 19 years for a company who took Employee Health, Safety and Environment seriously. In that time, I don’t remember ever wondering if the people I worked with or the Managers I worked for considered Health, Safety and Environment as the top priority. It was stated almost every day and reinforced with every job we performed through lock-out, tag-out procedures.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Perry Parendo Leave a Comment

Why Do DOE Upstream?

Often times DOE is considered a manufacturing tool. However, it can be used upstream during R&D and Operational Qualification (OQ) activities. There is much more leverage in this situation. A case study is provided from a client organization to bring the principles to life. This video is the slides and audio recording of the presentation at MDM Minneapolis, October 28, 2013. [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

  • « Previous Page
  • 1
  • …
  • 183
  • 184
  • 185
  • 186
  • 187
  • …
  • 278
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • How to Make ISO 55000 and ISO 55001 Successful 
  • Killer AI and Risk Based, Decision Making
  • What are You Missing?
  • Failure Management in Maintenance: Turning Setbacks into Success
  • Is Failure Data Essential for RCM? Insights from Resnikoff’s Conundrum

© 2026 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.