Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
    • Asset Reliability @ Work
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
    • Reliability Engineering Management DRAFT
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • An Introduction to Reliability Engineering
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Mike Sondalini Leave a Comment

Control Loops — Masters of Automatic Control

Control Loops — Masters of Automatic Control

What you will learn from this article.

  • Control loops automatically correct unwanted changes in a process.
  • A control loop consists of components to detect and adjust the process.
  • Control loop complexity reflects the accuracy and speed of control.
  • Explanation of ‘open loop’, ‘closed loop’, ‘feed back’, ‘feed forward’.

The sole purpose of using process control in, say, the making of beer, is to detect what is happening during manufacture and to decide if something needs to be changed to insure the beer meets the necessary specification. The key words are ‘to detect’, ‘to decide’, ‘to change’ and ‘to meet specification’. A control loop can do all these things automatically.

Control Loop Components

A control loop is made up of the components shown in Figure No 1. It consists of:

  • a sensor to detect the process,
  • a transmitter to make the sensor signal into an electrical signal,
  • a controller that tests that the signal meets a pre-set value and
    if not makes the adjustments required,
  • a final controlling element(s) that physically move and alter its
    position (e.g. a control valve),
  • a converter that changes an electrical signal into a proportional
    force or a force into an electrical signal (a transducer),
  • the medium (like steam, chilled water, etc) that provides the
    energy change to the process to produce the correction.
Figure No. 1 Feed Forward Control Loop Components

Control Loop Complexity

Control loop complexity depends on the final product specification. If the product acceptance range is wide then simple, inexpensive control loop components can be used. However if the required final product specification is demanding, the control loop becomes more complex and expensive. This is necessary in order to react fast enough to changing process inputs in-time to still produce the output product to specification.

Open and Closed Loops 

Very simple control loops that detect an incoming process variable and display the value to an operator are called ‘open loop’ control systems. In this case it is up to the operator to make any changes to the process. As soon as a final control element is added to allow incoming process variable adjustment the complexity and cost of the loop rises sharply. The final control element requires a decision-making device (the controller) to signal it to move. Such an arrangement is called a ‘closed loop’ control system because the sensor’s signal controls the reaction of the loop from the initially detected process change right through to the finally detected adjustment. The entire change starts and ends (closes) with the sensor detecting the proper required conditions.

Feed Back — Feed Forward Systems 

The requirements for the speed and accuracy of the control loop response determine whether ‘feed back’ or ‘feed forward’ control is used. Feed back control measures the final product and checks it is produced to within the specification tolerance. If it is not it within tolerance the final control element is adjusted to make corrections.

Feed forward control measures the incoming variables before they go through the process, making sure they are within preset tolerance before combining together to make the product. Feed forward control is the more complex and expensive method to use.

One can see that it is best to use the least complex and inexpensive control loop phylosophy possible. Complex loops require expensive components; great amounts of effort programming and tuning the controller; are easily ‘confused’ by abnormal process occurrences; require unending maintenance to retain their sensitivity; demand high levels of emergency spare parts and the presence of highly skilled operators and maintainers.

The right control loop choice can only be made when the product specification tolerance is well understood. If low cost control is required the product specification must have a wide range of customer acceptability. Tight tolerances add great cost.

Mike Sondalini – Equipment Longevity Engineer

Reference: Operative Certificate in Chemical Plant Skills Manual, Holmesglen College of TAFE, 1993

 


We (Accendo Reliability) published this article with the kind permission of Feed Forward Publishing, a subsidiary of BIN95.com

Web: trade-school.education
E-mail: info@trade-school.education

If you found this interesting you may like the ebook Process Control Essentials.

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

« Lessons from Scrum for Product Development Teams
Using the Maintenance Data You Already Have »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series articles provided courtesy of Feed Forward Publications and Lifetime Reliability Solutions.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • How Reliability Engineers Can Improve Their Communication in Information Sessions
  • FMEA Detection Risk: Insights and Advices
  • How to Structure Your ERM System
  • Rate of Occurrence of Failure
  • What is Six Sigma and How is it Used in Quality Engineering?

© 2023 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.