Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » Page 90

Articles

Find all articles across all article series listed in reverse chronological order.

by Nancy Regan Leave a Comment

What is Reliability and How Do We Get It?

What is Reliability and How Do We Get It?

In this episode, we answer two questions: 1) What is Reliability? 2) How do we get the Reliability we need from our machines? Nancy also discusses how we design our Reliability both literally and figuratively. The quality of our proactive maintenance and Default Strategies largely determines the Reliability we get from our equipment. Inherent Reliability is explained.

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by Sanjeev Saraf Leave a Comment

Lithium Battery Manufacturing: Minimize Fire Risks

Lithium Battery Manufacturing: Minimize Fire Risks

Lithium batteries catch fire if the anode and cathode materials contact each other. What causes short-circuit leading to anode-cathode contact?

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Robert (Bob) J. Latino Leave a Comment

My Reliability Journey

My Reliability Journey

Guest post by Ken Latino.

About 13 years ago, I began a reliability journey at a large paper mill. At that time, the mill was pretty reactive and I was naïve enough to think I was going to single handedly turn it around. While I thought I had all the answers and was going to teach the mill a thing or two about reliability, it ended up teaching me a hell of a lot more.

[Read more…]

Filed Under: Articles, on Systems Thinking, The RCA

by Mike Sondalini Leave a Comment

How Profit Contribution Mapping Turns Wasted Money into Outstanding Operational Productivity and Profits

How Profit Contribution Mapping Turns Wasted Money into Outstanding Operational Productivity and Profits

Value Stream Mapping is a business process improvement tool. It derives from the Toyota Production System where it was used to identify the seven wastes in a production process. It is now used across all business processes because the principle of finding and removing waste applies throughout every business.

[Read more…]

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

by Greg Hutchins Leave a Comment

Pareto Management: A Force to be Reckoned With?

Pareto Management: A Force to be Reckoned With?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The Pareto Principle, or more commonly the “80/20 rule”, is based upon the observation that 80% of the consequences of something are attributable to 20% of the causes.  The quality guru Joseph Moses Juran named the Principle in 1941 after the Italian economist who, in 1896, observed that 80% of the land in Italy was owned by 20% of the population.  The centenarian also similarly observed that 80% of quality problems result from 20% of the causes.  In the business world we also see that 80% of a company’s revenue is generated by only 20% of its customers.  As with life, things are not distributed either evenly or even fairly.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Ray Harkins Leave a Comment

Expanding your Opportunities

Expanding your Opportunities

As the quality manger for a tier two automotive supplier, I recently had the opportunity to hire a quality supervisor following the retirement of a long-time member of our team. Our company’s human resource manager and I worked together through the entire selection process. Given the status of our region’s economy and the recent closure of several large factories, I wasn’t surprised when our mailbox started filling up with resumes in response to ads on the popular Internet job sites. The typical respondent was a mid-career professional with over 15 years of experience in manufacturing that had either been recently laid-off due or who wanted to move up in their career.

[Read more…]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

by Sanjeev Saraf Leave a Comment

CSB: To Investigate Or Not To Investigate

CSB: To Investigate Or Not To Investigate

Last year, the Government Accountability Office (GAO) reported that the Chemical Safety Board (CSB) is not meeting its statutory mandate by investigating major chemical accidents.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Mike Sondalini Leave a Comment

Technological Inheritance Effect on Failure Rate, Defect Elimination and Reliability Effects

Technological Inheritance Effect on Failure Rate, Defect Elimination and Reliability Effects

Technological inheritance, defect inheritance, and quality inheritance transfer to the future. To create a better future for your organization you first must create a better past so it can later inherit the preordained successes you designed and imbedded into your company.

[Read more…]

Filed Under: Articles, Life Cycle Asset Management, on Maintenance Reliability

by Greg Hutchins Leave a Comment

Red Flags? They are All Red Flags

Red Flags? They are All Red Flags

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

“That’s a Red Flag!” goes the cry from some when something amiss is recognised.  However, many project participants don’t realise that their Project sails through a sea of flags and that, on some occasion, the flags can be read as red by somebody at some time.

In a similar nautical vein the Roman writer Ovid once poetized “The man who has experienced shipwreck shudders even at a calm sea“.  While written some 2,000 years ago it is as true today as it ever was and a reminder to us all that risks lurk everywhere.  Some risks may not be identified, let alone assessed and may go unnoticed until they strike.  We need to be aware and vigilant and avoid a complacent belief that a risk register is the be all and end all.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Larry George Leave a Comment

What’s Wrong Now? Multiple Failures?

What’s Wrong Now? Multiple Failures?

How is failure testing done on the Space Station? Could FTA (Fault Tree Analysis) be used in reverse to detect multiple failures given symptoms? That’s what NASA was programming in the 1990s. I proposed that the ratios P[part failure]/(part test time) be used to optimally sequence tests. Those ratios work if there are multiple failures, as long as failure rates are constant and failure times are statistically independent. 

[Read more…]

Filed Under: Articles, on Tools & Techniques, Progress in Field Reliability?

by Nancy Regan Leave a Comment

Are your Asset Management efforts worth your TIME?

Are your Asset Management efforts worth your TIME?

What does asset management have to do with TIME? Everything.

My mentor, John Moubray, taught me that our most valuable resource is TIME. Time is WAY more valuable than money. 

How you spend your TIME determines IF and HOW your asset management efforts will pay off. In other words, will your efforts help you achieve the kind of equipment Reliability you’re looking for?

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by Sanjeev Saraf Leave a Comment

OSHA Chemical NEP

OSHA Chemical NEP

On July 27, 2009 OSHA launched its National Emphasis Program (NEP) targeted at chemical facilities. The NEP will operate as a one-year pilot program during which OSHA will conduct planned inspections of chemical facilities.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Robert (Bob) J. Latino Leave a Comment

So how Should I use the SAP-PM Breakdown Indicator?

So how Should I use the SAP-PM Breakdown Indicator?

Guest post by Ken Latino.

There are many opinions about the use of the breakdown flag in SAP-PM. I would like to offer my opinion on this debate. First, I do not like the term “breakdown”. With a name like breakdown, nobody will want to check the box! No one likes to admit that a something has failed or is broken. I wish the field were named “reliability event” to take away this negative connotation.  I will discuss this in more detail later.

[Read more…]

Filed Under: Articles, on Systems Thinking, The RCA

by Mike Sondalini Leave a Comment

Cheap Way To High Pumping Circuit Availability

Cheap Way To High Pumping Circuit Availability

Using Reliability Principles for a Cheap Way To High Pumping Circuit Availability. High plant availability is achieved by having redundant equipment that can be brought on-line as soon as the operating unit has failed. Redundancy is expensive as there are two items to buy, two to install and two to maintain at full operating capacity. There is an alternate option for maintaining high pumping circuit availability by designing quick methods to bring mobile equipment into the circuit when pumps are down. This article explains how to set-up piping for a mobile pump to maintain operation when the normal duty pump is out of use.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Greg Hutchins Leave a Comment

Email @50 Years – Blessing or Risk

Email @50 Years – Blessing or Risk

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Email is 50 this year…its Golden Anniversary!  It ‘happened’ in 1971 when Ray Tomlinson, the late computer engineer and first user, sent a transmission to himself utilising two independent computers…a revolutionary innovation at the time.  The content of that primordial message is long forgotten and the same may also be the fate of many of the ~300 billion emails that are sent almost every day by the estimated 4 billion users around the world.  Communication is said to bring us together or set us apart and email is no different.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 88
  • 89
  • 90
  • 91
  • 92
  • …
  • 273
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Quality Objective 11: ADDRESS HIGH-RISK FAILURES
  • 3 Ways to Improve your Reliability Program
  • Risk Management Models
  • Continuous Improvement
  • Developing Enterprise Asset Management, Maintenance and Reliability KPIs

© 2026 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.